Spanish manufacturing industry faces a 2025 scenario marked by a dual requirement: relentless pressure on operating margins and an increasingly strict labor regulatory framework regarding ergonomics and objectivity in performance measurement. In this context, the use of the manual stopwatch and the subjective performance rating of work ("Rating") have become technical and legal liabilities.
Modern methods engineering demands defensible standards. This is where the MOST System (Maynard Operation Sequence Technique) positions itself not only as a time study tool, but as an essential data management standard to feed MES/ERP systems and Digital Twin models. Unlike traditional time study, MOST reduces analysis time in a 40:1 ratio, offering structured data that eliminates the analyst's arbitrariness.
What is the MOST System and why does it replace MTM-1?
MOST is a Predetermined Motion Time System (PMTS) derived from MTM, but designed to be applied at a significantly higher speed without sacrificing the statistical accuracy required in general industry.
While MTM-1 focuses on the exhaustive analysis of basic micro-movements (reach, grasp, turn, release) — which makes it ideal for very short cycles but impractical for most medium-scale assembly processes — the MOST system changes the paradigm: it focuses on the movement of objects.
The Sequence Block Concept
The genius of Basic MOST lies in the logical grouping of movements. Instead of analyzing each finger or joint separately, MOST uses "Sequence Blocks" that describe the entirety of the action required to move an object. This simplifies the analysis for operations with medium variability and cycles typically ranging between 0.5 and 3 minutes, covering the vast majority of assembly, machining and internal logistics activities.
Sequence Algorithms and Models in Basic MOST
For the industrial engineer or time study analyst, the power of MOST lies in its three basic sequence models. These algorithms make it possible to parameterize any manual task into a standardized alphanumeric code.
1. General Move
Applied when an object is moved freely through the air without mechanical restrictions. The sequence follows the following formula:
Where the parameters represent phases of the action:
- A (Action Distance): Action distance (mainly horizontal).
- B (Body Motion): Body motion (bending down, sitting down, steps).
- G (Gain Control): Gain control of the object (grasp complexity).
- P (Placement): Placement of the object (required precision).
2. Controlled Move
Used when the object remains in contact with a surface or its movement is restricted by a fixed path (e.g. levers, handwheels, sliding a box).
Here, process parameters are introduced:
- M (Move Controlled): The controlled movement itself.
- X (Process Time): Machine process time (if any).
- I (Alignment): Final alignment after the movement.
3. Tool Use
Integrates the use of common hand tools (wrenches, hammers, knives) within the general move sequence.
The central space is filled with parameters specific to the technical action, such as:
- F (Fasten): Fasten/Assemble.
- L (Loosen): Loosen/Disassemble.
- C (Cut): Cut.
- S (Surface Treat): Surface treatment (clean, sand).
Units of Measure (TMU) and Statistical Accuracy
As with other PMTS, MOST uses the TMU (Time Measurement Unit) to guarantee decimal accuracy in cost-per-minute calculations.
- Technical Conversion: .
Indexing Methodology
Each parameter in the formulas above ($A, B, G$, etc.) receives a predetermined index value based on engineering tables . The standard time is calculated by summing the indices and multiplying the result by 10.
Example: If a sequence totals 15 in indices, the time is .
Reliability and Defense in Audits
From a statistical perspective, Basic MOST guarantees a 95% confidence level with a margin of error of for aggregate cycles.
This mathematical foundation makes the system "Audit-Proof". In the face of labor inspections or union negotiations, the time does not depend on the observer's opinion about the operator's pace (as in stopwatch time study), but on the established work method. If the method is followed, the time is indisputable.
Strategic Advantages: MOST versus Stopwatch Time Study and MTM
For an Operations Director, the choice of measurement methodology directly impacts the ROI of the engineering department.
| Characteristic | Manual Stopwatch Time Study | MTM-1 | Basic MOST |
|---|---|---|---|
| Analysis Speed | Slow (Requires 1:1 observation) | Very Slow (250:1 relative to the cycle) | Fast (40:1 relative to the cycle) |
| Performance Rating | Analyst's technical judgment | N/A (Predetermined 100% ILO) | N/A (Predetermined 100% ILO) |
| Basis for OEE | "Dirty" historical data | Clean data | Clean and standardized data |
| Simulation | Impossible (Requires a physical process) | Possible | Ideal for design phases |
| Documentation | Poor | Excessive | Clear step-by-step trace of the method |
MOST is 5 times faster than MTM-1 and completely eliminates the "Performance Rating" factor. Moreover, by generating alphanumeric codes, it enables the immediate digitization of processes for plant simulators.
Regulatory Framework and Ergonomics (Spain Horizon 2025)
The implementation of MOST goes beyond productivity; it is a regulatory compliance tool.
Compliance with the Workers' Statute
Labor regulations are moving toward requiring algorithmic transparency. Using stopwatches and judging that an operator works at "80% activity" is legally weak. MOST offers an objective technical breakdown: the assigned time corresponds strictly to the necessary movements, complying with ILO standards.
Integration with ISO 11228 (Ergo-MOST)
There is a direct correlation between MOST parameters and physical workload. A high value in the B (Body Motion) parameter — such as (bending down and standing up) — automatically alerts to ergonomic risks. This makes it possible to calculate rest and fatigue allowances based on data rather than estimates, aligning with standard ISO 11228 and EN 1005 on manual handling of loads and repetitive movements.
Cronometras Solutions: Advanced Methods Engineering
At Cronometras, we understand that data is the plant's most valuable asset. We do not merely measure times; we establish robust and defensible engineering standards.
Our technical consulting division offers specific solutions for the transition to predetermined systems:
- Basic MOST Implementation: We create your production standards from scratch in 2 weeks, versus the 8 weeks a traditional time study would require. We deliver the analysis sheets ready for integration into your ERP.
- Audit of "Legacy Times" and OEE: Many OEE calculations are wrong because the "Ideal Cycle Time" is based on flawed historical data. We carry out a cleanup of your database with MOST to uncover the real hidden capacity of your lines.
- In-Company Technical Training: We train your engineers and middle managers in the system's logic. Not only to calculate, but so they understand how simplifying a method (lowering an index from to $A_{3}$) directly impacts the unit cost of the product.
Would your production standards withstand a technical audit today?
Subjectivity is a risk your plant cannot afford. Request a MOST feasibility diagnosis today with our expert consultants and turn your work measurement into a competitive advantage.
[Contact Cronometras Engineering]
Don't want to do it yourself? We do it for you from €800
If you prefer to outsource it, Cronometras delivers a complete time and motion study from a single video: elemental breakdown, OIT/TAL fatigue allowances, standard time with tolerances, and a report in PDF + Excel + JSON ready to present to management.